Dedicated locality research platform

1st Habitable Floor

Ground floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Exclusive 1RK and 1 BHK apartments

Tower Name Chakrapani Complex Phase 2 A wing Fire Exits 1
Total Floors 7 Refuge Areas 1
Number of Elevators 1 Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Chakrapani Complex Phase 2 B wing Fire Exits 1
Total Floors 7 Refuge Areas 1
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 5 Tower Layout View Layout
Tower Name Chakrapani Complex Phase 2 C wing Fire Exits 1
Total Floors 7 Refuge Areas 1
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name A WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name B WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name C WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-06-2023
Possession Availability as per RERA
Proposed Date of Completion 30-06-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 30
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Sports
  • Kids Play Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Water Storage
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Kids Play Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Water Storage
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Kids Play Area
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Water Storage
Fire Safety
  • Sprinkler System
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
© Propscience.com. All Rights Reserved.