Dedicated locality research platform

1st Habitable Floor

4th

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Big residential township

Tower Name Tower 18 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 19 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 2 Configurations Present 1.5 BHK,1 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower 20 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK,Studio
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 21 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,Studio
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 22 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK,1 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 23 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Building No 18 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 19 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 20 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 21 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 22 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 23 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Possession Availability
Possession Date 31/12/2023
Possession Availability as per RERA
Proposed Date of Completion 30-12-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 35
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities