Dedicated locality research platform

1st Habitable Floor

1st

Views
Water Body / City Skyline
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Casa Viva by Lodha, is a world-class development in Thane’ ...

Tower Name Tower 4 Fire Exits --
Total Floors 30 Refuge Areas 5
Number of Elevators 3 Configurations Present 1 BHK,3 BHK
Flats Per Floor 9 Tower Layout View Layout
Wing Name Tower 4 Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 30
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30-11-2021
Possession Availability as per RERA
Proposed Date of Completion 28-11-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 95
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 13
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 95
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 90
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 60
View More