Dedicated locality research platform

1st Habitable Floor

First Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Biggest Township

Tower Name ESTELA A Fire Exits 2
Total Floors 19 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name ESTELA B Fire Exits 2
Total Floors 19 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name ESTELA C Fire Exits 2
Total Floors 19 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name ESTELA A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts --
Wing Name ESTELA B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts --
Wing Name ESTELA C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30-06-2022
Possession Availability as per RERA
Proposed Date of Completion 30-06-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 70
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 22
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 80
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 60
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 30
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.