1st Habitable Floor

3rd

Views
--
Floor to Ceiling Height

--

Project Theme

Gated Complex

Tower Name Building A Fire Exits 2
Total Floors 17 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name BUILDING A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Wing Name BUILDING B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31-05-2022
Possession Availability as per RERA
Proposed Date of Completion 31-05-2020
Revised Proposed Date of Completion 30-11-2022
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 85
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 75
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 90
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 90
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 85