Dedicated locality research platform

1st Habitable Floor

3rd

Views
--
Floor to Ceiling Height

--

Project Theme

Gated Community.Vaastu Compliant

Tower Name A Wing Fire Exits 2
Total Floors 9 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name B Wing Fire Exits 2
Total Floors 16 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name C Wing Fire Exits 2
Total Floors 9 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Wing Name KAVYA PARK A WING Number of Podium 2
Number of Basements 1 Number of Slabs of Superstructure 9
Number of Plinth 1 Number of Stilts 2
Wing Name KAVYA PARK B WING Number of Podium 2
Number of Basements 1 Number of Slabs of Superstructure 16
Number of Plinth 1 Number of Stilts 12
Wing Name KAVYA PARK C WING Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 9
Number of Plinth 1 Number of Stilts 2
Possession Availability
Possession Date 31-12-2020
Possession Availability as per RERA
Proposed Date of Completion 31-12-2014
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 38
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 2
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 38
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.