Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Water RO Plant. Zero Stamp Duty/Registration/GST & Maintenan ...

Tower Name Guruprabha Sankul Fire Exits --
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Guruprabha Sankul Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 4
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2020
Possession Availability as per RERA
Proposed Date of Completion 30-06-2021
Revised Proposed Date of Completion 29-12-2020
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 6
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.