Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Strategically constructed

Tower Name Lotus Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 3 Tower Layout
Tower Name Orchid Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 3 Tower Layout
Tower Name Clover Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 3 Tower Layout
Tower Name Lily Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 3 Tower Layout
Tower Name Rose Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 3 Tower Layout
Wing Name Lotus Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 2 Number of Stilts 14
Wing Name Orchid Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 2 Number of Stilts 10
Wing Name Lily Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 3
Wing Name Rose Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 2 Number of Stilts 14
Wing Name Clover Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 2 Number of Stilts 10
Possession Availability
Possession Date 31-12-2022
Possession Availability as per RERA
Proposed Date of Completion 30-06-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth 2
1 X Number Of Podiums --
1 Stilt Floor 14
1 X Number Of Slabs Of Super Structure 5
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.