Dedicated locality research platform

1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Shree Nidhi Heights Fire Exits --
Total Floors 17 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 3 Tower Layout
Wing Name Shree Nidhi Heights Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30/06/2021
Possession Availability as per RERA
Proposed Date of Completion 30-06-2021
Revised Proposed Date of Completion 01-01-1970
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 80
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.