Dedicated locality research platform

1st Habitable Floor

1st

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Gated Complex

Tower Name Building A Fire Exits 2
Total Floors 14 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Building B Fire Exits 2
Total Floors 14 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout
Wing Name Building A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 1
Number of Plinth 1 Number of Stilts --
Wing Name Building B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 1
Number of Plinth 1 Number of Stilts --
Wing Name Building D Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth 1 Number of Stilts --
Wing Name Row house Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-03-2021
Possession Availability as per RERA
Proposed Date of Completion 30-03-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100
View More
View Less
Amenities
Sports
  • Badminton Court
  • Multipurpose Court
  • Tennis Court
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Leisure
  • Yoga Room / Zone
  • Senior Citizen Zone
  • Pet Friendly
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • MyGate / Security Apps
  • Earthquake Resistant Design
Green Features
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
Business & Hospitality
  • Clubhouse
  • Multipurpose Hall
Fire Safety
  • Sprinkler System
  • Fire rated doors / walls
  • Fire Hose
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Badminton Court
  • Multipurpose Court
  • Tennis Court
  • Jogging Track
  • Kids Play Area
  • Gymnasium
  • Indoor Games Area
Leisure
  • Yoga Room / Zone
  • Senior Citizen Zone
  • Pet Friendly
Security & Sanitation
  • Society Office
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • MyGate / Security Apps
  • Earthquake Resistant Design
Green Features
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
Business & Hospitality
  • Clubhouse
  • Multipurpose Hall
Fire Safety
  • Sprinkler System
  • Fire rated doors / walls
  • Fire Hose
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
© Propscience.com. All Rights Reserved.