Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Exclusive 2 & 3 BHK apartments

Tower Name Aradhna Fire Exits 1
Total Floors 6 Refuge Areas 1
Number of Elevators 1 Configurations Present 2 BHK,3 BHK
Flats Per Floor 2 Tower Layout View Layout
Wing Name SIMRANN Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31-05-2018
Possession Availability as per RERA
Proposed Date of Completion 31-05-2018
Revised Proposed Date of Completion 31-12-2018
Sr. No Task/Activity % Work Done
1 Excavationn 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Water Storage
© Propscience.com. All Rights Reserved.