1st Habitable Floor

5th floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Clubhouse & lobbies designed by Susanne Khan

Tower Name Tower D Fire Exits 2
Total Floors 28 Refuge Areas 3
Number of Elevators 4 Configurations Present 4 BHK
Flats Per Floor 2 Tower Layout View Layout
Tower Name Tower E Fire Exits 2
Total Floors 28 Refuge Areas 3
Number of Elevators 4 Configurations Present 3 BHK
Flats Per Floor 2 Tower Layout View Layout
Tower Name Tower F Fire Exits 2
Total Floors 28 Refuge Areas 3
Number of Elevators 4 Configurations Present 3 BHK
Flats Per Floor 2 Tower Layout View Layout
Tower Name Tower G Fire Exits 2
Total Floors 29 Refuge Areas 3
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower H Fire Exits 2
Total Floors 29 Refuge Areas 3
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Wing D Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Wing E Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Wing F Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Wing G Number of Podium --
Number of Basements 1 Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts 1
Wing Name Wing H Number of Podium --
Number of Basements 1 Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2020
Possession Availability as per RERA
Proposed Date of Completion 30-06-2018
Revised Proposed Date of Completion 30-12-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 99
View More
View Less