Dedicated locality research platform

1st Habitable Floor

3rd

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Gated Complex with features like unshared walls and front ga ...

Tower Name T4 Fire Exits 2
Total Floors 37 Refuge Areas 7
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name T5 Fire Exits 2
Total Floors 37 Refuge Areas 7
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name T1 Fire Exits 2
Total Floors 42 Refuge Areas 8
Number of Elevators 3 Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name T3 Fire Exits 2
Total Floors 42 Refuge Areas 8
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 7 Tower Layout View Layout
Wing Name T4 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 37
Number of Plinth 1 Number of Stilts 1
Wing Name T5 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 37
Number of Plinth 1 Number of Stilts 1
Wing Name T1 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 42
Number of Plinth 1 Number of Stilts 1
Wing Name T3 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 47
Number of Plinth 1 Number of Stilts 1
Wing Name Commercial - Block A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 1
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31-03-2028
Possession Availability as per RERA
Proposed Date of Completion 31-12-2022
Revised Proposed Date of Completion 30-03-2029
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 60
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 70
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 36
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 76
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 44
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 7
View More
View Less
Amenities
Sports
  • Multipurpose Court
  • Kids Play Area
  • Gymnasium
Leisure
  • Yoga Room / Zone
  • Pet Friendly
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
Green Features
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Clubhouse
Fire Safety
  • Sprinkler System
  • Fire rated doors / walls
  • Fire Hose
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Sports
  • Multipurpose Court
  • Kids Play Area
  • Gymnasium
Leisure
  • Yoga Room / Zone
  • Pet Friendly
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
Green Features
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Clubhouse
Fire Safety
  • Sprinkler System
© Propscience.com. All Rights Reserved.