1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

A premium residential project that offers the best living sp ...

Tower Name Onyx Building No 5 Fire Exits 2
Total Floors 30 Refuge Areas 3
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Onyx Building No 5 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 30
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-05-2022
Possession Availability as per RERA
Proposed Date of Completion 31-05-2021
Revised Proposed Date of Completion 30-11-2022
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 96
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 25
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 30
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 2
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 30
View More
View Less