Dedicated locality research platform

1st Habitable Floor

4th

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Big residential township

Tower Name A3 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name A4 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name B2 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name C3 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name C4 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name A3 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name A4 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name B2 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name C3 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name C4 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2020
Possession Availability as per RERA
Proposed Date of Completion 31-12-2019
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 100
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.