Dedicated locality research platform

1st Habitable Floor

6th

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Gated Community

Tower Name T4 Crystal Spires 2 Fire Exits 2
Total Floors 26 Refuge Areas 2
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name T5 Crystal Spires 1 Fire Exits 2
Total Floors 26 Refuge Areas 3
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name T4 Crystal Spires 2 Number of Podium 2
Number of Basements 1 Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name T5 Crystal Spires 1 From 15th To 21th Floors Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 11
Number of Plinth -- Number of Stilts --
Wing Name T5 Crystal Spires 1 Upto 14th Floors Number of Podium 2
Number of Basements 1 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-07-2020
Possession Availability as per RERA
Proposed Date of Completion 31-12-2018
Revised Proposed Date of Completion 31-01-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 95
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 50
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 80
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 95
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 80
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.