Dedicated locality research platform

1st Habitable Floor

3rd

Views
--
Floor to Ceiling Height

--

Project Theme

Gated Complex

Tower Name BLDG S1 Fire Exits 2
Total Floors 21 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name BLDG S2 Fire Exits 2
Total Floors 21 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK,2.5 BHK,3 BHK,5 BHK
Flats Per Floor 4 Tower Layout
Tower Name BLDG S3 Fire Exits 1
Total Floors 21 Refuge Areas 2
Number of Elevators 2 Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor 3 Tower Layout
Wing Name BLDG S1 Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts --
Wing Name BLDG S2 Number of Podium 2
Number of Basements 1 Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts --
Wing Name BLDG S3 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30-06-2022
Possession Availability as per RERA
Proposed Date of Completion 31-05-2020
Revised Proposed Date of Completion 30-06-2022
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 40
1 X Number Of Podiums 1
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Sports
  • Kids Play Area
  • Gymnasium
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
Leisure
  • Pet Friendly
Green Features
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Clubhouse
Sports
  • Kids Play Area
  • Gymnasium
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
Leisure
  • Pet Friendly
Green Features
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Clubhouse
Sports
  • Kids Play Area
  • Gymnasium
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
Leisure
  • Pet Friendly
Green Features
  • Landscaped Gardens
  • Water Storage
Business & Hospitality
  • Clubhouse
© Propscience.com. All Rights Reserved.