1st Habitable Floor

1st Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name C - WING Fire Exits 2
Total Floors 19 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout
Tower Name C1 - WING Fire Exits 2
Total Floors 13 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout
Tower Name K - WING Fire Exits 2
Total Floors 10 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout
Tower Name L - WING Fire Exits 2
Total Floors 21 Refuge Areas 3
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 6 Tower Layout
Tower Name M - WING Fire Exits 2
Total Floors 20 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout
Tower Name N - WING Fire Exits 2
Total Floors 20 Refuge Areas 3
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout
Wing Name C - WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts 1
Wing Name C1 - WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name K - WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 10
Number of Plinth 1 Number of Stilts 1
Wing Name L - WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Wing Name M - WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 21
Number of Plinth 1 Number of Stilts 1
Wing Name N - WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-12-2021
Possession Availability as per RERA
Proposed Date of Completion 31-03-2020
Revised Proposed Date of Completion 30-12-2020
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 80
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 60
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 90
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 90
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 80