1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Strategically Constructed and located

Tower Name A Wing Fire Exits 2
Total Floors 18 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name B Wing Fire Exits 2
Total Floors 18 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name A WING Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name B WING Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-04-2019
Possession Availability as per RERA
Proposed Date of Completion 30-04-2019
Revised Proposed Date of Completion 30-04-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls,internal Plaster, Floorings Within Flats/premises, Doors And Windows Ot Each Of Flats/premises 99
1 Sanitary Fittings Within Flats/premises, Electrical Fittings Witihin Flats/premises 91
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installations Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment/ Crz Noc, Finishing To Entrance Lobby(s),plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation/completion Certificate 100`