Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

All basic necessary things are nearby

Tower Name Building A1 Fire Exits --
Total Floors 07 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 25 Tower Layout
Tower Name Building A2 Fire Exits --
Total Floors 06 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 30 Tower Layout
Tower Name Building D2 Fire Exits --
Total Floors 6 Refuge Areas --
Number of Elevators 4 Configurations Present Studio
Flats Per Floor 54 Tower Layout
Tower Name Building D3 Fire Exits --
Total Floors 6 Refuge Areas --
Number of Elevators 4 Configurations Present Studio
Flats Per Floor 58 Tower Layout
Tower Name Building D1 Fire Exits --
Total Floors 6 Refuge Areas --
Number of Elevators 4 Configurations Present 1 BHK
Flats Per Floor 60 Tower Layout
Wing Name Building A1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 07
Number of Plinth 01 Number of Stilts 01
Wing Name Building A2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 06
Number of Plinth 01 Number of Stilts 01
Wing Name Building D2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 06
Number of Plinth 01 Number of Stilts 01
Wing Name Building D3 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 06
Number of Plinth 01 Number of Stilts 01
Wing Name Building S1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 02
Number of Plinth 01 Number of Stilts --
Wing Name Building D1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 06
Number of Plinth 01 Number of Stilts 01
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-12-2020
Revised Proposed Date of Completion 30-12-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 37
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 42
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Sports
  • Kids Play Area
Green Features
  • Waste Segregation
  • Water Storage
Sports
  • Kids Play Area
Green Features
  • Waste Segregation
  • Water Storage
Sports
  • Kids Play Area
Green Features
  • Waste Segregation
  • Water Storage
Sports
  • Kids Play Area
Green Features
  • Waste Segregation
  • Water Storage
Sports
  • Kids Play Area
Green Features
  • Waste Segregation
  • Water Storage
© Propscience.com. All Rights Reserved.