Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Highrise Tower

Tower Name Evershine Amavi 303 Phase 2 Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Evershine Amavi 303 Phase 2 Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Building No 10 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 11 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 12 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 13 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2022
Possession Availability as per RERA
Proposed Date of Completion 30-12-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 15
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 80
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 75
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 80
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 50
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --