Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Gated Community

Tower Name Rustomjee Virar Avenue L1,L2 and L4 Wing A Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Rustomjee Virar Avenue L1,L2 and L4 Wing B Fire Exits 2
Total Floors 15 Refuge Areas 2
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Wing A Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Wing B Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Retail Building Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth -- Number of Stilts --
Possession Availability
Possession Date 31-01-2022
Possession Availability as per RERA
Proposed Date of Completion 31-01-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 80
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 29
1 Sanitary Fittings Within The Flat/premises, Electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 45
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 11