Dedicated locality research platform

1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Wing C Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout
Tower Name WIng D Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout
Tower Name Wing E Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout
Tower Name Wing F Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout
Tower Name Wing G Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout
Wing Name Wing C Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name Wing D Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name Wing E Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name Wing F Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name Wing G Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30/12/2020
Possession Availability as per RERA
Proposed Date of Completion 31-12-2017
Revised Proposed Date of Completion 31-12-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 50
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 50
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 75
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.