Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Small budget homes

Tower Name Sairaj Residency Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 7 Tower Layout View Layout
Wing Name SAIRAJ RESIDENCY Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 4
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 16-02-2022
Possession Availability as per RERA
Proposed Date of Completion 16-08-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.