1st Habitable Floor

1st

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Strategically constructed

Tower Name A Wing Fire Exits --
Total Floors 7 Refuge Areas --
Number of Elevators 2 Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor 10 Tower Layout View Layout
Wing Name LK DAMAYANTI RESIDENCY Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/03/2022
Possession Availability as per RERA
Proposed Date of Completion 30-03-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 90
1 X Number Of Slabs Of Super Structure 85
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 40
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 30
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 40
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 20
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 10