Dedicated locality research platform

1st Habitable Floor

1st floor

Views
Road View / No View
Floor to Ceiling Height

Greater than 10 feet

Project Theme

--

Tower Name Gurukrupa Ugam-Wing A Fire Exits 1
Total Floors 16 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Gurukrupa Ugam-Wing B Fire Exits 1
Total Floors 16 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout
Wing Name UGAM Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 16
Number of Plinth 10 Number of Stilts 1
Possession Availability
Possession Date 31-12-2023
Possession Availability as per RERA
Proposed Date of Completion 30-06-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor 90
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 80
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 50
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 70
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 50
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 30