Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Water Body / City Skyline
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name Rohin Fire Exits 2
Total Floors 40 Refuge Areas 4
Number of Elevators 9 Configurations Present Studio,2 BHK,3 BHK
Flats Per Floor 10 Tower Layout
Wing Name ROHIN Number of Podium 7
Number of Basements 1 Number of Slabs of Superstructure 52
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30-03-2023
Possession Availability as per RERA
Proposed Date of Completion 30-09-2023
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 54
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 3
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 17
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.