Dedicated locality research platform

1st Habitable Floor

Ist floor

Views
Road View / No View
Floor to Ceiling Height

Greater than 10 feet

Project Theme

--

Tower Name Lifescapes Prithvii- Wing A Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Lifescapes Prithvii- Wing A Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout
Tower Name Lifescapes Prithvii- Wing B Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Lifescapes Prithvii- Wing B Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout
Tower Name Lifescapes Prithvii- Wing C Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Lifescapes Prithvii- Wing C Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout
Tower Name Lifescapes Prithvii- Wing D Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Tower Name Lifescapes Prithvii- Wing D Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout
Wing Name Wing A Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name Wing B Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name Wing C Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name Wing D Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 29-10-2018
Possession Availability as per RERA
Proposed Date of Completion 21-01-2022
Revised Proposed Date of Completion 31-01-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 85
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.