1st Habitable Floor

5th Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name Cypress Fire Exits --
Total Floors 35 Refuge Areas --
Number of Elevators 6 Configurations Present 3.5 BHK,4 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Ebony Fire Exits --
Total Floors 35 Refuge Areas --
Number of Elevators 3 Configurations Present 3 BHK,4 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Redwood Fire Exits --
Total Floors 35 Refuge Areas --
Number of Elevators 3 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Pinewood Fire Exits --
Total Floors 35 Refuge Areas --
Number of Elevators 7 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Wing E Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 44
Number of Plinth 1 Number of Stilts 1
Wing Name Wing F Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 9
Number of Plinth 1 Number of Stilts 38
Wing Name Wing G Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 38
Number of Plinth 1 Number of Stilts 1
Wing Name Wing H Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 43
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2019
Possession Availability as per RERA
Proposed Date of Completion 31-10-2017
Revised Proposed Date of Completion 31-12-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100