Dedicated locality research platform

1st Habitable Floor

2nd Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name The Trees, Residential Phase 1 - A Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name The Trees, Residential Phase 1 - B Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Residential Phase 1 - C Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Residential Phase 1 - D Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name The Trees, Residential Phase 1 - E Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK,Penthouse
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Residential Phase 1 - F Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 2 BHK,3 BHK,Duplex,Penthouse
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Residential Phase 1 - G Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Residential Phase 1 - H Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Residential Phase 1 - I Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK,Penthouse
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Residential Phase 1 - J Fire Exits 1
Total Floors 18 Refuge Areas 1
Number of Elevators 2 Configurations Present 2 BHK,3 BHK,4 BHK,5 BHK,Penthouse
Flats Per Floor 4 Tower Layout
Wing Name A Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name B Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name C Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 7
Number of Plinth 2 Number of Stilts 1
Wing Name D Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 7
Number of Plinth 1 Number of Stilts 1
Wing Name E Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name F Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name G Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 12
Number of Plinth 1 Number of Stilts 1
Wing Name H Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 12
Number of Plinth 1 Number of Stilts 1
Wing Name I Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Wing Name J Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 18
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30/06/2021
Possession Availability as per RERA
Proposed Date of Completion 30-06-2021
Revised Proposed Date of Completion 30-06-2022
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 100
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.