Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Water Body / City Skyline
Floor to Ceiling Height

Greater than 10 feet

Project Theme

Freeway View

Tower Name Wing A Fire Exits --
Total Floors 12 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK,Studio
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing B Fire Exits --
Total Floors 12 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK,Studio
Flats Per Floor 4 Tower Layout
Tower Name Wing C Fire Exits --
Total Floors 12 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK,Studio
Flats Per Floor 4 Tower Layout
Wing Name SAFAL SAI WING A WING B AND WING C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name SAFAL SAINATH Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2022
Possession Availability as per RERA
Proposed Date of Completion 31-12-2022
Revised Proposed Date of Completion 30-12-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 80
1 X Number Of Podiums --
1 Stilt Floor 80
1 X Number Of Slabs Of Super Structure 75
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 70
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 35
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 60
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 10
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 33
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.