Dedicated locality research platform

1st Habitable Floor

4th

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Big residential township

Tower Name Tower 1 Fire Exits --
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower 2 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 3 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 4 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower 5 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower 6 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 7 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower 8 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 9 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Tower 10 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower 11 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower 12 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1 BHK,1.5 BHK,2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name Building No 2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 3 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 4 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 5 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 6 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 7 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 8 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 9 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 10 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 11 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Building No 12 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Wing Name Commercial Building Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 19
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth -- Number of Stilts 1
Possession Availability
Possession Date 30-06-2023
Possession Availability as per RERA
Proposed Date of Completion 30-06-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 49
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 90
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.