Tower Name Vrindavan Fire Exits 2
Total Floors 3 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name VRINDAVAN Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 4
Number of Plinth -- Number of Stilts 1
Possession Availability
Possession Date 31-07-2023
Possession Availability as per RERA
Proposed Date of Completion 31-01-2024
Revised Proposed Date of Completion 28-12-2020
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --