Dedicated locality research platform

1st Habitable Floor

2nd

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Durable Construction With Ample Amenities

Tower Name Tower D Fire Exits 2
Total Floors 42 Refuge Areas 8
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name Tower D Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 44
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30/09/2024
Possession Availability as per RERA
Proposed Date of Completion 30-09-2025
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 63
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.