1st Habitable Floor

5th

Views
--
Floor to Ceiling Height

--

Project Theme

Ease of connectivity

Tower Name CALISTA Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name CALISTA Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 35
Number of Plinth 2 Number of Stilts 2
Possession Availability
Possession Date 31-08-2017
Possession Availability as per RERA
Proposed Date of Completion 31-08-2017
Revised Proposed Date of Completion 31-12-2017
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100