Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Strategically constructed

Tower Name Wing A Fire Exits 1
Total Floors 7 Refuge Areas --
Number of Elevators 1 Configurations Present 3 BHK
Flats Per Floor 2 Tower Layout
Tower Name Wing B Fire Exits 1
Total Floors 7 Refuge Areas --
Number of Elevators 1 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Wing Name Emrald Tower Wing A Number of Podium --
Number of Basements 1 Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name Emrald Tower Wing B Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2024
Possession Availability as per RERA
Proposed Date of Completion 30-06-2025
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 80
1 X Number Of Basement(s) And Plinth 80
1 X Number Of Podiums --
1 Stilt Floor 80
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 5
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --