Dedicated locality research platform

1st Habitable Floor

3rd

Views
--
Floor to Ceiling Height

--

Project Theme

Strategically constructed

Tower Name Century One Fire Exits 2
Total Floors 16 Refuge Areas 2
Number of Elevators 2 Configurations Present 1.5 BHK,1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Century One Number of Podium 2
Number of Basements 1 Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/03/2022
Possession Availability as per RERA
Proposed Date of Completion 01-10-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
Sports
  • Kids Play Area
  • Gymnasium
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
Green Features
  • Waste Segregation
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Leisure
  • Sit-out Area
© Propscience.com. All Rights Reserved.