1st Habitable Floor

4th

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Exclusive 1, 2 BHK apartments

Tower Name Daffodil Fire Exits 2
Total Floors 26 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Elymus Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Fern Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Garget Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Gloria Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Lavender Fire Exits 2
Total Floors 26 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Marigold Fire Exits 2
Total Floors 26 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Daffodil Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Elymus Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 25
Number of Plinth 1 Number of Stilts 1
Wing Name FERN Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 25
Number of Plinth 1 Number of Stilts 1
Wing Name Garget Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 25
Number of Plinth 1 Number of Stilts 1
Wing Name Gloria Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 25
Number of Plinth 1 Number of Stilts 1
Wing Name Lavender Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Marigold Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 26
Number of Plinth 1 Number of Stilts 1
Wing Name Commercial Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 2
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31/12/2020
Possession Availability as per RERA
Proposed Date of Completion 30-03-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks.- 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 100