1st Habitable Floor

Ground floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Mini Township

Tower Name Haware Pinnacle A, B, C, D, E ,F, G, H, I, J Fire Exits 1
Total Floors 4 Refuge Areas --
Number of Elevators -- Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor -- Tower Layout
Wing Name A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name D Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name E Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name F Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name G Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name H Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name I Ground-Fourth Floor Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name J Ground-Fourth Floor Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts --
Wing Name Proposed Building I Floors 5th to 7th Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth -- Number of Stilts --
Wing Name Proposed Building J Floors 5th to 7th Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 3
Number of Plinth -- Number of Stilts --
Possession Availability
Possession Date 31-03-2020
Possession Availability as per RERA
Proposed Date of Completion 31-03-2020
Revised Proposed Date of Completion 30-09-2020
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100